First Place Home Improvement First Place Home ImprovementCustom Tile Work 704-305-2851

What a tile shower costs in Kannapolis, NC

What a tile shower costs comes down to size, tear-out and the tile you pick. Below is what changes the price, rough ranges to plan around, and how the week goes, day by day.

Call 704-305-2851

What changes the price

How big the shower is

Square footage of wall and floor is the first number. A standard alcove and a large walk-in are different jobs.

What has to come out first

Tearing out an old tub, an old tile job or a rotted floor is work before the work. What is found behind it can change the day.

The tile you pick

Large format, mosaic, natural stone and herringbone all take longer to set than a straight run of subway. The tile price is yours; the labor changes with it.

The waterproofing system

A proper membrane system costs more in materials than doing it the cheap way. It is not the place to save money.

Niches, benches and curbs

Each one is framed, blocked, waterproofed and tiled. They are worth having and they add time.

Curbless or a low curb

A curbless shower means cutting into the floor structure to drop the pan. It is the biggest single change to a price.

Rough numbers to plan around

These are what this kind of work runs in Rowan, Cabarrus and nearby counties. Starting ranges for planning, not a quote. We price your job when we look at it.

A standard tub-to-shower conversion
$7,000 to $13,000

The tub and surround come out. A tiled walk-in shower goes back in on the same footprint, with a poured base, slope, waterproofing, curb and niche.

A full custom walk-in shower
$10,200 to $17,200

A larger shower than the tub left behind, with tile carried to the ceiling instead of stopping at the shower head.

A bathroom floor
$780 to $1,100

A 5x8 room. The tub covers part of the floor, so about 27 square feet of it gets tiled, in an ordinary size laid straight.

A kitchen backsplash
$1,300 to $3,100

Counter to the underside of the upper cabinets all the way around, about 26 square feet. Small area, high number of cuts.

For a fuller breakdown by room and style, see what tile work typically costs in this market.

How the week goes, day by day

Day 1
Tear-out

The old shower or floor comes out and the space is cleared down to the framing.

Day 2
Poured base and slope

The base is poured in cement and shaped by hand to fall to the drain.

Day 3
Board and waterproofing

Backer board goes on, then the membrane, seams and corners sealed.

Days 4-5
Setting tile

Layout first, then the walls, then the floor, cuts landing where they should.

Day 6
Grout

Grout goes in and gets cleaned off before it sets.

Day 7
Seal and hand back

Sealed, wiped down, and the bathroom is yours again.

Typical working days for a standard shower. We confirm the count for your job when we look at it.

Curious what our finished jobs look like? See the before and after photographs of our tile work. Curious what happens behind the tile? See how we build a tile shower, step by step.

Call 704-305-2851